DESIGN STANDARDS GALVANIZED :
Southern Cross steel water tanks have been designed by a registered professional engineer to comply wit h the relevant sections of the following Australian Standards:
AS 4100 STEEL STRUCTURES CODE.
AS 1170 PT. 2 WIND LOADING CODE
AS 1170 PT. 4 EARTHQUAKE LOADING CODE.
AS3600 CONCRETE STRUCTURES CODE
AS/NZS 4680 HOT DIP GALVANIZING CODE
AS 1657 LADDERS AND PLATFORM CODE
Southern Cross steel Water Tanks Can Also Be Designed To Comply With:
AS/NZS 3500.1.2- NATIONAL PLUMBING & DRAINAGE CODE.
AS 2419.1 FIRE HYDRANT INSTALLATIONS CODE.
AS 2118.1 AUTOMATIC FIRE SPRINKLER SYSTEMS CODE.
AS 2941 FIXED FIRE PROTECTION INSTALLATIONS CODE.
Engineers certification for individual tanks can be supplied when required. This certification covers desighn and manafacture only.
Where a certificate of compliance for the completed tank is required, this will have to be arranged and quoted on.
Specification compliance: Where tanks are required to particular specifictions, a copy of all documents relating to the tank design, materials, etc.
must be forwarded to the Tanks and Towers Division at the Toowoomba factory, so that suitable recommendations can be made.
DESIGN STANDARDS MARVIPLATE:
Southern Cross water tanks have been designed by a registered professional engineer to comply wit h the relevant sections of the following Australian Standards:
AS 4100 STEEL STRUCTURES CODE.
AS 1170 PT. 2 WIND LOADING CODE
AS 1170 PT. 4 EARTHQUAKE LOADING CODE.
AS3600 CONCRETE STRUCTURES CODE
AS/NZS 4680 HOT DIP GALVANIZING CODE
AS 1657 LADDERS AND PLATFORM CODE
AS 2070 PT 2 PLASTIC MATERIALS FOR FOOD CONTACT USE
Southern Cross Water Tanks Can Also Be Designed To Comply With:
AS/NZS 3500.1.2 NATIONAL PLUMBING & DRAINAGE CODE.
AS 2419.1 FIRE HYDRANT INSTALLATIONS CODE.
AS 2118.1 AUTOMATIC FIRE SPRINKLER SYSTEMS CODE.
AS 2941 FIXED FIRE PROTECTION INSTALLATIONS CODE.
Engineers certification for individual tanks can be supplied when required. This certification covers desighn and manafacture only.
Where a certificate of compliance for the completed tank is required, this will have to be arranged and quoted on.
Specification compliance: Where tanks are required to particular specifictions, a copy of all documents relating to the tank design, materials, etc.
must be forwarded to the Tanks and Towers Division at the Toowoomba factory, so that suitable recommendations can be made.